Decision Register

Compliance and risk

Screening, monitoring, sampling and the incident call. Sanctions and AML lines carry the false negative that matters most; the impact assessment is usually filed from here.

Task types in this function

15 task types, 1 decide alone by default, 0 carry an Annex III use

What reaches this function

EU AI ActAttaches to every line through the literacy duty and the listing check; the deployer duties, the logs, the oversight design and the impact assessment attach to the lines that carry an Annex III use; the transparency notice attaches to the lines that face a person. On every line: EU AI Act Art. 4, EU AI Act Art. 5, EU AI Act Art. 6.
GDPRAttaches to a line that decides alone with a legal or similarly significant effect on a person (Article 22), with the information duties and the DPIA beside it; the information duty alone attaches to every line that faces a person. On every line: the rows on the lines that decide.
ISO/IEC 42001Attaches to every line through the responsible-use controls (A.9), to every line with a named tool through the supplier control (A.10.3), and to the lines that draft or decide through verification, operation, logging and impact assessment; the ISO/IEC 23894 risk rows render with it. On every line: ISO/IEC 42001 A.9.2, ISO/IEC 42001 A.9.3, ISO/IEC 42001 A.9.4.
ISO/IEC 42005Attaches to every line through the timing and intended-use items, to listed uses through the thresholds, and to the lines that decide through the performance, recording, monitoring and documentation items of the impact assessment. On every line: ISO/IEC 42005 5.4, ISO/IEC 42005 6.3.4.
NIST AI RMFAttaches to every line through the MEASURE items on performance under deployment conditions, to named tools through third-party monitoring, and to the lines that decide through the oversight and determination items. On every line: AI RMF MS-2.3, AI RMF MS-2.5.
CPS 230Attaches, for an APRA-regulated entity, through the internal controls on every line, the material service provider paragraphs on every named tool, the critical operations paragraph on the lines that decide, and the controls-testing paragraph on the lines whose error lands in a return. On every line: CPS 230 para 28.

Minute the lines in this function

Paste the list; every task in this function is placed in its type, given its stakes class and its listed-use flags, and carries the obligation rows above. Eight lines free, no account.

Build my decision register